4
DATE REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY SHEET OF
12/01/2023 A Initial Release J. Doe J. Smith J. Manager 1 1
PROJECT: WIND TURBINE BASE DESIGN
CLIENT: GREEN ENERGY CORP.
LOCATION: OFFSHORE WIND FARM
DATE: 12/01/2023
DWG NO: WT-001
5000
14.0
14.0
14.0
14.0
2x11
600
2
4
250
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
2. MATERIAL: STEEL S355JO
3. SURFACE TREATMENT: HOT DIP GALVANIZING
4. WELDING: PER AWS D1.1
5. TOLERANCES: +/- 1MM FOR SMALL PARTS, +/- 3MM FOR LARGE ASSEMBLIES
6. INSPECTION: VISUAL AND DYE PENETRANT
7. PACKAGING: CRATED FOR OCEAN FREIGHT
8. SHIPPING: HEAVY LIFT VESSEL
REVISION HISTORY:
REV A - 12/01/2023 - INITIAL RELEASE
DESIGNED BY: J. DOE
CHECKED BY: J. SMITH
APPROVED BY: J. MANAGER
CONTACT: [email protected]
PHONE: +1-555-0199
FAX: +1-555-0198
ADDRESS: 123 WIND POWER BLVD, TURBINE CITY, TC 12345
Engineering Drawing — Green Energy Corp., WT-001 (2023)