← Rubio, Marco

Engineering Drawing — Green Energy Corp., WT-001 (2023)

6060 SW 13 Clients Ferro Miami-Dade County Building Department Rubio Lobbyist Documents

Open / download PDF

Document text

Page 1
4 DATE REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY SHEET OF 12/01/2023 A Initial Release J. Doe J. Smith J. Manager 1 1 PROJECT: WIND TURBINE BASE DESIGN CLIENT: GREEN ENERGY CORP. LOCATION: OFFSHORE WIND FARM DATE: 12/01/2023 DWG NO: WT-001 5000 14.0 14.0 14.0 14.0 2x11 600 2 4 250 NOTES: 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. MATERIAL: STEEL S355JO 3. SURFACE TREATMENT: HOT DIP GALVANIZING 4. WELDING: PER AWS D1.1 5. TOLERANCES: +/- 1MM FOR SMALL PARTS, +/- 3MM FOR LARGE ASSEMBLIES 6. INSPECTION: VISUAL AND DYE PENETRANT 7. PACKAGING: CRATED FOR OCEAN FREIGHT 8. SHIPPING: HEAVY LIFT VESSEL REVISION HISTORY: REV A - 12/01/2023 - INITIAL RELEASE DESIGNED BY: J. DOE CHECKED BY: J. SMITH APPROVED BY: J. MANAGER CONTACT: [email protected] PHONE: +1-555-0199 FAX: +1-555-0198 ADDRESS: 123 WIND POWER BLVD, TURBINE CITY, TC 12345