canam steel
Project: WEST MIAMI SKY MODEL B
Mark: R08
10/20/20
FORCES IN MEMBERS [Total]
Left Reaction = 2.41/
Right Reaction = 2.41/
Dead Load
Live Load
Total
No. Top chord 0.00 -1.70 0.238 2.11* 0.238 2.11*
1.1 0.00 -1.70 0.238 2.11* 0.238 2.11*
2.2 0.00 -2.85 0.238 2.70* 0.238 2.70*
3.3 0.00 -2.85 0.238 2.70* 0.238 2.70*
Bottom Chord 0.00 0.00 11.75 * .100 1.17* 11.75 * .100 1.17*
2.1 0.00 0.00 11.75 * .100 1.17* 11.75 * .100 1.17*
2.2 4.29 0.00 11.75 * .100 1.17* 11.75 * .100 1.17*
End Diagonal 0.00 0.00 10.1/2 1.171 0.58 2.2.5/8* 1.00 0.84
Internal Diagonals 0.00 0.00 10.1/2 1.171 0.58 2.2.5/8* 1.00 0.84
4.1 1.08 -0.90 10.1/2 1.171 0.58 2.2.5/8* 1.00 0.84
5.2 1.08 -0.90 10.1/2 1.171 0.58 2.2.5/8* 1.00 0.84
Internal Verticals center 0.00 -1.63 10.1/2 1.171 0.58 2.2.5/8* 1.00 0.84
5.1 0.00 -1.63 10.1/2 1.171 0.58 2.2.5/8* 1.00 0.84
6.2 0.00 -1.63 10.1/2 1.171 0.58 2.2.5/8* 1.00 0.84
Secondary web member 0.00 -0.57 10.1/2 1.106 0.22 1.4* 1.00 0.84
7.1 0.00 -0.57 10.1/2 1.106 0.22 1.4* 1.00 0.84
Bottom spacing of lifting lugs spaced at 21" C/C (533 mm) Lateral bracing
Bottom Chord -> 8 Rod(s) Minimum
Page 2 of internal truss for Mark 1 No
21" C/C spacing of lifting lugs back to back. 80 = 2 angles welded by lugs. 80 = 1 round bar.
The welding length of web members is calculated according to use continuous joints.
The welding length of bottom chord is calculated according to use continuous joints.
Designer: Scott Armentrout
Date: 10/20/20
Area to Raker: 19.79 ft2
Design: Substructure (Steel)
Material Spec: Weight
2029
5
Business Record — Canam Steel, West Miami Sky Model B (2020)
6060 SW 13 Clients Ferro Miami-Dade County Building Department Rubio Lobbyist Documents