SITE PLAN
PROJECT NO. 2023-001
DATE: 01/15/2023
DRAWN BY: J. DOE
CHECKED BY: J. SMITH
REVISIONS:
A - INITIAL ISSUE
NORTH
SOUTH
EAST
WEST
SCALE: 1" = 20'-0"
PROPERTY LINE
BUILDING SETBACK
EASEMENT
PARKING LOT
DRIVEWAY
WALKWAY
LANDSCAPING
UTILITY EASEMENT
RIGHT OF WAY
NOTES:
1. ALL DIMENSIONS ARE TO CENTERLINE UNLESS OTHERWISE NOTED.
2. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS BEFORE COMMENCING WORK.
3. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.
4. ALL WORK SHALL COMPLY WITH LOCAL BUILDING CODES AND REGULATIONS.
5. PERMIT REQUIRED FOR ALL CONSTRUCTION.
ITEM DESCRIPTION QTY UNIT COST
SITE WORK CLEARING AND GRUBBING 1 LS $5,000.00
CONCRETE PAVEMENT 500 SQ FT $2,500.00
LANDSCAPING TREES 10 EA $1,000.00
TOTAL ESTIMATED COST $8,500.00