← Rubio, Marco

Technical Specification — Canam Steel, West Miami Sky Model B Detail 2-W100-001 (1993)

6060 SW 13 Clients Ferro Miami-Dade County Building Department Rubio Lobbyist Documents

Open / download PDF

Document text

Page 1
canam steel Project: WEST MIAMI SKY MODEL B Date: 07/22/93 Make: 107 Reinforcing only where needed. The weldment is made back to back to back. No 2 angles welded to each other. 20.6 clipped angle at 1.5 gap. Le weldment est fait dos a dos a dos. Pas 2 angles soudes a chaque autre. 20.6 angle coupe a 1.5 ecart. In the absence of continuous joints. En l'absence de joints continus. Detail no. 2-W100-001 Dessin no. 2-W100-001 101 ( 100% 101 ( 100% Aero & Vibration 21-26 Bld Aero & Vibration 21-26 Bld Shop automatically lifted Atelier automatique (eleve) Material: 50ksi welds Materiau: 50ksi welds 5 2779