← Rubio, Marco

Technical Specification Sheet — Truss Installation Tolerances and Span Limits

6060 SW 13 Clients Ferro Miami-Dade County Building Department Rubio Lobbyist Documents

Open / download PDF

Document text

Page 1
4 All lateral bracing lapped at least 2 trusses. Temporary Field Check: Lateral Bracing for a 600mm Maximum Required. Diagonal bracing on end verticals. DO NOT TRUSS TRUSS DEPTH (mm) | TRUSS SPACING (mm) | MAX SPAN (m) | MAX SPAN (m) 200 | 24 | 3.0 | 6 | 3.0 | 6 250 | 24 | 3.5 | 6 | 3.5 | 6 300 | 24 | 4.0 | 6 | 4.0 | 6 350 | 24 | 4.5 | 6 | 4.5 | 6 SF - Single Phase | SF - Single Phase | SF - Single Phase | SF - Single Phase INSTALLATION TOLERANCES SPAN | L/360 | L/240 | L/180 | L/120 | L/90 | L/60 3m | 8mm | 12mm | 16mm | 24mm | 32mm | 48mm 4m | 11mm | 17mm | 22mm | 33mm | 44mm | 66mm 5m | 14mm | 21mm | 28mm | 42mm | 56mm | 84mm 6m | 17mm | 25mm | 33mm | 50mm | 67mm | 100mm 7m | 19mm | 29mm | 39mm | 58mm | 78mm | 117mm 8m | 22mm | 33mm | 44mm | 67mm | 89mm | 133mm OUT-OF-PLANE INSTALLATION TOLERANCES SPAN | L/360 | L/240 | L/180 | L/120 | L/90 | L/60 3m | 8mm | 12mm | 16mm | 24mm | 32mm | 48mm 4m | 11mm | 17mm | 22mm | 33mm | 44mm | 66mm 5m | 14mm | 21mm | 28mm | 42mm | 56mm | 84mm 6m | 17mm | 25mm | 33mm | 50mm | 67mm | 100mm 7m | 19mm | 29mm | 39mm | 58mm | 78mm | 117mm 8m | 22mm | 33mm | 44mm | 67mm | 89mm | 133mm OUT-OF-PLANE INSTALLATION TOLERANCES SPAN | L/360 | L/240 | L/180 | L/120 | L/90 | L/60 3m | 8mm | 12mm | 16mm | 24mm | 32mm | 48mm 4m | 11mm | 17mm | 22mm | 33mm | 44mm | 66mm 5m | 14mm | 21mm | 28mm | 42mm | 56mm | 84mm 6m | 17mm | 25mm | 33mm | 50mm | 67mm | 100mm 7m | 19mm | 29mm | 39mm | 58mm | 78mm | 117mm 8m | 22mm | 33mm | 44mm | 67mm | 89mm | 133mm Maximum Sag/Deflection L/240 = 1/2 Piano Truss Depth WARNING: Do not cut trusses. DANGER: Under no circumstances should construction lose any description be placed on trussed trusses. Frame 6