canam steel
Project: WEST MIAMI SKY MODEL B
0124005
127816
Mark: 107
POREAS IN MEMBERS (kips)
(150 psi concrete, 50 ksi steel)
Left Reaction = 4.70/ 0.00 kips Right Reaction = 4.70/ 0.00 kips
EFF. LENGTH = 13.56 in
PROPOSED WELD: 2-1/2 INCHES LONG
MEMBER LOAD LENGTH
Top chord Top tension
1.1 0.00 -4.21 0 0.28 2-1/4
1.2 0.00 -4.21 0 0.21 2-1/4
1.3 0.00 -2.49 0 0.21 2-1/4
1.4 0.00 -2.49 0 0.24 2-1/4
1.5 0.00 -11.26 Top tension 0 0.02 2-1/4
Bottom chord 12-1.5 x .100 2 31 0.35 2-1/4
2.1 0.00 0.00 0 0 31 0.26 2-1/4
2.2 7.72 0.00 0 0 31 0.26 2-1/4
2.3 14.44 0.00 0 0 31 0.26 2-1/4
2.4 14.44 0.00 0 0 31 0.26 2-1/4
2.5 10.16 0.00 0 0 31 0.26 2-1/4
2.6 10.16 0.00 12-1.5 x .100 2 31 0.26 2-1/4
End Diagonal 18-5/4 (40) 2 157 0.66 2-5 7/16 .185 - 1
Diagonals 4.1 3.77 0.00 18-5/4 (40) 2 105 0.41 1-1/4 .185 - 0 3/4
4.2 3.77 0.00 0 0 105 0.24 2-1/4
4.3 1.47 0.00 18-5/4 (40) 2 104 0.41 1-1/4 .185 - 0 3/4
4.4 1.47 0.00 0 0 104 0.24 2-1/4
Web members 5.1 0.00 -3.65 18-5/4 (40) 2 81 0.35 2-1/4 .185 - 0 3/4
5.2 0.00 -3.65 0 0 81 0.24 2-1/4
5.3 0.00 -1.45 18-5/4 (40) 2 104 0.41 1-1/4 .185 - 0 3/4
5.4 0.00 -1.45 0 0 104 0.24 2-1/4
5.5 0.00 -1.45 20 5/4 (40) 2 104 0.35 1-1/4 .185 - 0 3/4
5.6 0.00 -1.45 0 0 104 0.25 1-1/4
Secondary Web members 7.1 0.00 -0.33 20 5/4 (40) 2 35 0.12 1-1/4 .185 - 0 3/4
TIE RODS (ALLEN-MERIDIAN)
Maximum spacing between lines = (-.46 + .00)
Minimum spacing between lines = (-1.94 + .00)
Calculable position on all line surface = (-1.94 + .00)
Maximum = 0.75 in.
BRACING
Maximum spacing between rows of bridging at speed at 21' C/C (533 mm).
Lateralwise supports
POSITION
@ Bottom Chord => 1 Row(s) Minimum
11' 0 1/2"
Keep 1/2' clear distance for walk 1 3/4
21/29
5
Structural Analysis — Canam Steel, West Miami Sky Model B
6060 SW 13 Clients Ferro Miami-Dade County Building Department Rubio Lobbyist Documents