canam steel
Project: WEST MIAMI SIX MODEL B
Mark: H-5
02/20/85
12/07/84
P O N D S I N M E M B E R s [Kips]
Left Reaction = 3.99/
No tension required.
REQUIRED MATERIAL
Size
Unit
Length
Right Reaction = 3.99/
(Eff. Depth = 18-(6 in)
0.00 Kips
25' Span at 25' Span
Sizing
REQUIRED MATERIAL
REQUIRED MATERIAL
Top chord
1.1 0.00 -4.08 0 0.25 2-1/4"
1.2 0.00 -5.72 0 0.35 1-7/8"
1.3 0.00 -7.32 0 0.35 2-1/4"
1.4 0.00 -8.92 0 0.45 2-1/4"
1.5 0.00 -9.62 0 0.49 2-1/4"
Bottom Chord
2.1 0.00 0.00 15 15.7 100 2 1/8 0.33 2-1/8 10/1"
2.2 0.00 0.00 40 0 00 0.44 1-1/8"
2.3 0.00 0.00 40 0 00 0.44 1-1/8"
2.4 15.42 0.00 40 2 40 0.50 0-"
2.5 15.42 0.00 40 2 40 0.50 0-"
Web Members
3.1 7.31 0.00 15 15.7 350 2 1/8 0.28 2-1/8 1/4"
3.2 10 9/16" 2 1/8 0.28 2-1/8 1/4" .170 - 1"
Diagonal Tension Rod
4.1 0.00 0.00 10 9/16" 0 156 0.16 1-1/8" .170 - 0 3/4"
4.2 1.00 0.00 40 0 156 0.22 0-"
4.3 1.00 0.00 40 0 156 0.22 1-1/8" .0- 3/4"
Diagonal Tension Member
5.1 0.00 -2.16 10 9/16" 0 105 0.24 1-1/8 7/8" .170 - 0 3/4"
5.2 0.00 -3.76 40 0 105 0.30 0-"
5.3 0.00 -7.12 40 0 105 0.35 0-"
5.4 0.00 -7.12 40 0 105 0.35 0-"
5.5 0.00 -8.72 10 9/16" 0 105 0.42 1-1/8" .170 - 3/4"
Cantilever Sub-member
7.1 0.00 -0.76 10 9/16" 0 88 0.20 1-1/8 5/8" .170 - 0 3/4"
VIBRATOON (ADAMS-ADAMS)
- Full bridge partition between floor joists
- Minimum partition between floor joists
- Frequency
Maximum spacing between rows of bridging
Top Chord: Roll Bars spaced at 21" C/C (533 mm). Lateral-to supports
Bottom Chord: 1 No. 1 No. 1 No. Minimum
9" - 4 1/2"
P0021008
Keep 1/3 strand increase for wind : No
Relative to 2" x 10" joists, 16" o.c. (406 mm) max. spacing, 12" x 12" x 12" concrete slab on metal deck, 10 psf superimposed dead load, 40 psf live load.
The welding length of web members is calculated according to AISC continuous joints.
10/13/84
26/29
5
Structural Calculation — Canam Steel, Project West Miami Six Model B (1984)
6060 SW 13 Clients Ferro Miami-Dade County Building Department Rubio Lobbyist Documents